### PROJECT DESCRIPITON

The aim of the project is to solve the pollution problem of the Grand Backa Canal by building a sewerage network and connecting wastewater to the regional sewerage and treatment system of Vrbas and Kula.

### WORKS DESCRIPTION

- Construction, testing and commissioning of a sewerage network in the length of 42,500.00m from PVC pipes Ø200 - 400mm with 8 new pumping stations with associated pressure network and reconstruction of two old pumping stations;
- Construction, testing and commissioning of a 31,500mm PEHD 315mm transit pressure network pipeline;
- Construction of the Central Plant for Mechanical Treatment, Collection and Distribution of Waste Water via Transit Pipeline to the Waste Water Treatment Plant in Vrbas Wastewater in Crvenka.



 

 

 



 

 

### LOCATION:

Kula – Crvenka, Municipality of Kula, Serbia

### INVESTOR:

Municipality of Kula

### CONTRACT VALUE:

522.116.038,02 RSD

(4.350.966,83 EUR)

### EXPECTED COMPLETION OF WORKS:

April, 2019.



 

 

 

 

 

 





 

 

 

 





   ![](/sites/g/files/dvc2836/files/styles/default/public/image/2019/08/Izvo%C4%91enje%20nedostaju%C4%87e%20uli%C4%8Dne%20kanalizacione%20mre%C5%BEe%20u%20Kuli%20i%20Crvenki%20i%20izgradnja%20tranzitnog%20potisnog%20voda%20Crvenka-Kula%20i%20njegovih%20prate%C4%87ih%20objekata.png.webp?itok=Ny697uSZ)