### PROJECT DESCRIPITON

Construction and reconstruction of the primary sewage network from Rumenicka Street to the main pumping station GC2 in Novi Sad.

### WORKS DESCRIPTION

\- Ductile pipe installation:

- Ø 1600 mm, L=324.64m
- Ø 1400 mm, L=1747.34m
- Ø 1200 mm, L=340.99m
- Ø 1000 mm, L=265.65m
- Ø 800 mm, L=471.28m
- Ø 600 mm, L=250.72m

Overall length of 3,400.62 m ';

- 62 reinforced concrete inspection chamber;
- UPVC pipe connections totaling 1682.17 m ';
- 144 storm sewers;
- ...



 

 

 



 

 

### LOCATION: 

Novi Sad, Serbia

### INVESTOR: 

Public Utility Company ’’Vodovod i kanalizacija’’ Novi Sad

### TYPE OF THE PROJECT:

RED FIDIC

### CONTRACT VALUE:

2.643.722,44 EUR

### EXPECTED COMPLETION OF WORKS:

04/2013 – 10/2014



 

 

 

 

 

 





 

 

 

 