Construction of water treatment plant in TPP Kostolac B has started

Within the Thermal Power Plant "Kostolac B" realisation of one major project for evironmental improvement – construction of waste water treatment plant decentralysed type has started. The plant will consist of three plants and local atmoshperic oil separator.

The first one is a WWTP after removal desulphurisation and HPV water, with two-lines capacity, 45 cubic meters per hour each. There is also a greasy and oily waste water treatment plant, with capacity of 30 cubic meters per hour each, and the third one is sanitary wastewater treatment plant.

For more info find out on next link.