Design and performing works of land remediation at Fiat Automobili Srbija DOO Kragujevac main site

PROJECT DESCRIPITON

- Preparation of technical documentation at the level of the main project, obtaining all permits from relevant state institutions, performing works on soil remediation in order to complete the overall process of planned remediation.

- The aim of the works was cleaning the factory, which involves the excavation of contaminated soil and replacement of clean soil with sampling and testing before, during and after completion of the works. In addition to soil testing, continuous measurement of toxic substances in air and water was carried out.

- The contaminated soil has been treated in the process of thermal desorption at a temperature between 450 and 470°C, which allows evaporation and thus the disappearance of any traces of hydrocarbons. Pollutant collection was performed using a filter bag. Treatment capacity is between 10 and 30 T / h.

WORKS DESCRIPTION

Amounts:

  • land remediation: approx. 80,000 m3;
  • terrain cleaning: approx. 40,000 m3;
  • contaminated soil treatment: approx. 150,000 m3;
  • breaking and removing concrete sidewalks: 7,000 m3;
  • ...

LOCATION:

Kragujevac, Serbia

INVESTOR:

FIAT AUTOMOBILI SRBIJA d.o.o. Kragujevac

TYPE OF THE PROJECT:

YELLOW FIDIC

CONTRACT VALUE:

21.569.857,75 EUR

EXPECTED COMPLETION OF WORKS:

11/2010 – 02/2013